If you work a shift you weren't scheduled for this is called an unscheduled shift.
There are two ways you can create a timesheet for this type of shift:
- You can clock in for an unscheduled shift at the time of working the shift and then clock out when finished.
- You can add a new timesheet for a shift you have worked in the past (you can not create future timesheets). Note: Your organisation must have enabled permissions for team members to create timesheets for you to be able to do this.